Point of Maximum risk is taken as the Peak of the 2 Sigma Upper Bollinger Band
Current risk is taken as the (Current Upper Bollinger Band) / (Peak Upper Bollinger Band)
Austria risk level =7%
Germany risk level =25%
Open Border Risk = SQRT(0..07*0.25)= 13% Risk