PROTECTED SOURCE SCRIPT

Moving Averages (SMA and EMA)

تم تحديثه
Plot the simple moving averages (SMA) and/or exponential moving averages (EMA).
The length of the lookback period and the type of moving average can be changed in the inputs tab of the indicator.
Line-weight and colours can be edited in the style tab of the indicator.

The default is to plot the SMAs using a length of 20, 50, 100 and 200.
ملاحظات الأخبار
Added options to select the source of prices to use in the calculation ("close", "open", "high", "low", "(high + low + close + open)/4", "(high + low)/2", "(high + low + close)/3")
ملاحظات الأخبار
Added more options.
Now you can select from:
  • Simple Moving Averages
  • Exponential Moving Averages
  • Symmetrically Weighted Moving Average
  • Weighted Moving Averages
  • Volume-weighted Moving Averages
  • Moving average used in RSI
  • Arnaud Legoux Moving Averages


ملاحظات الأخبار
Simplified the inputs tab.
ملاحظات الأخبار
Streamlined and simplified the inputs.
ملاحظات الأخبار
Missed a few before. Temp update to fix errors.
ملاحظات الأخبار
Reverted to the previous version as TView fixed bug.
ملاحظات الأخبار
Fixed mistake on the source price code.
ملاحظات الأخبار
Added an option for double exponential moving averages (DEMA).
ملاحظات الأخبار
I have added an option to plot a moving average ribbon.
You can customize all features and can plot the colour based on whether the line if sloping up (green), down (red) or "flat" (orange).
لقطة
ملاحظات الأخبار
Added an option to plot an envelope around one of the moving averages using a user input percentage.
ملاحظات الأخبار
V2.01
-Fixed an error with the color when using position relative to the price (had them flipped by accident)
almacrossoverDouble Exponential Moving Average (DEMA)emacrossoverMoving AveragesrmasmasmacrossoverSWMAWeighted Moving Average (WMA)

نص برمجي محمي

تم نشر هذا النص البرمجي بمصدر غير مفتوح ويمكنك استخدامه بحرية. يمكنك جعله مفضلاً لاستخدامه على الرسم البياني. لا يمكنك مشاهدة أو تعديل كود المصدر الخاص به.

هل تريد استخدام هذا النص البرمجي على الرسم البياني؟

إخلاء المسؤولية